Hidden Canyon Logbook

Visits to Hidden Canyon site:

2013

7-8-2013

  • Removed last soil profiles (destroyed 2 Decagon sensors in process)
  • Broke down sensors and wiring on towers.
  • Pulled out the rest of the forest instrumentation and put in pile.

6-20-2013

  • DOSE revisit - couldn't complete coring
  • Cleaned up pinflags and soil resp collars (should do another sweep tho)

6-11-2013

  • Collected remaining litterbags - had to dig plot 3, litterbag 2 out of 10cm of snow.
  • Shut down F1 datalogger.
  • Removed profiles 5, 6, 7, and 8

2012

Oct 22, 2012

  • Reconnected wiring at F1 datalogger.
  • Removed profiles 2 and 4.

Oct 19, 2012

Site breakdown with Allison, Laurel, and Pataki lab (Tara, Meghan, LaShaye).

  • Removed profiles 1, 1d, 3, 3d, 9 and 10.
  • Removed Mux1
  • Removed sensors on Forest tower.
  • Cleanup of flagging, ropes, signage.
  • Brought down extra enclosure/battery from solar tower.

Oct 17, 2012

  • Canopy photos at all soil profiles - leaves on aspen are now gone.
  • Collected litterbags

Oct 8, 2012

  • Sapling pre-dawn xylem water potential
  • Fixed wiring at MUX 1 and it looks like everything is working again.

Oct 6, 2012

  • Measured LiCor respiration at all collars.
  • Sapling mid-day xylem water potential
  • Surface VWC measurements at all locations.
  • There is a problem with MUX1 - wiring is chewed up and it is not working.

Sept 12, 2012

  • Returned with the repaired LiCor and measured LiCor respiration at all collars.

Sept 9, 2012

  • Measured LiCor respiration at all collars, but there is a problem with the instrument. These fluxes will need to be tossed.
  • Sapling pre-dawn and mid-day xylem water potential.
  • Surface VWC measurements at all locations.

Aug 26, 2012

  • Measured LiCor respiration at all collars.
  • Sapling pre-dawn and mid-day xylem water potential, mature pre-dawn only.
  • Surface VWC measurements at all locations.

Aug 9-10, 2012

  • Measured LiCor respiration at all collars.
  • Sapling pre-dawn and mid-day xylem water potential
  • Surface VWC measurements at all locations.
  • 2nd DOSE measurement/sample collection (peak drought)

July 26-27, 2012

  • Measured LiCor respiration at all collars.
  • Sapling and mature tree pre-dawn and mid-day xylem water potential
  • Surface VWC measurements at all locations.

July 17, 2012

  • Hemispherical photos of all litterbag/collar and soil profile locations - with Tasha.

July 11, 2012

  • Measured LiCor respiration at all collars.
  • Sapling pre-dawn and mid-day xylem water potential.
  • Mature tree pre-dawn xylem water potential.
  • Surface VWC measurements at all locations.

June 25, 2012

  • Measured LiCor respiration at all collars.
  • Sapling (only) pre-dawn and mid-day xylem water potential
  • Surface VWC measurements at all locations.

June 18, 2012

  • Did all DOSE measurements

June 4, 2012

  • Measured LiCor respiration at all collars - Note that the IRGA was spanned in the lab last week.
  • Mature/sapling pre-dawn and mid-day xylem water potential
  • Surface VWC measurements at all locations.
  • Collected the last litterbag (P3-2)

May 31, 2012

  • Collected all litterbags.
  • Logged snowcover at all grid points (one remaining - 30E, 20N).
  • Moved and reinserted all respiration collars (<1m from last years location).

May 21, 2012

  • Measured SWE at all plots and reps.
  • Logged snowcover at all grid points
  • Snow cover is effectively gone, except from 2 measurement locations (bags/collars)

May 14, 2012

  • Measured SWE at all plots, all reps.
  • Logged snowcover at all grid points (and other points).

May 8, 2012

  • Measured SWE in all plots. all 6 measurements.
  • Logged snowcover at all grid points (and other points).
  • Messed with datalogger
  • Collected full column cores from each plot for dust loading analysis.

Apr 30, 2012

  • Fourth dust deposition - all 6 plots, ~3000g each
  • Messed with datalogger
  • Logged snow at all grid points

Apr 27, 2012

  • Measured SWE in all plots, 4 measurements each
  • Sampled all inlets
  • 3 full column samples taken for dust loading
  • Messed with datalogger

Apr 24, 2012

  • Took hemispherical canopy photos at all SWE measurement points
  • Fiddled with forest datalogger
  • Logged clear grid points - there were several.

Apr 19, 2012

  • Measured SWE in all plots, 5 measurements each
  • Third dust deposition - all 6 plots, ~3000g each
  • Messed with datalogger again

Apr 15, 2012

  • Sampled all inlets
  • Measured SWE in plots 1-4 (2 measurements each)
  • Messed with datalogger again...

Apr 10, 2012

  • Second dust deposition - all 6 plots, ~3000g each
  • Measured SWE in all plots. n=6 in all 6 plots.
  • Messed with datalogger again - seems to be the wiring below the box, was working ok when I left.

Apr 3, 2012

  • Visited to try and fix sensor problems again - not sure if it worked.
  • Dust is still visible on the treatment plots, despite the new snow from a few days ago.

Mar 30, 2012

  • First dust deposition - all 6 plots, ~3000g each
  • Measured SWE in all plots. n=2 in plots 1-4, n=4 in 5&6 - figured I could count some of the measurements from earlier in the week for plots 5 & 6.

Mar 27, 2012

  • Sampled all inlets
  • Measured SWE in plots 1-4 (3 measurements each)
  • Messed around with datalogger wiring, but was not able to restore measurements of soil sensors.

Mar 21, 2012

Made a quick trip up to try to fix soil moisture datalogging again. Still having trouble identifying the problem.

  • Excavated snow around base of forest datalogger post and checked wires.
  • Retaped some chewed (lightly chewed) wires and tried to put more slack in them - didn't seem to do much though.
  • Disconnected treatment IR radiometer, and forest Vaisala (not sure if this will help or not, but these sensors are malfunctioning anyways.)
  • When I left all sensors were working, though sometimes intermittently it seemed.
  • Took a snow sample from the board (2 cores, 37cm depth).

Mar 12, 2012

  • Sampled all inlets
  • Measured SWE in all plots (3 measurements each)
  • The bad soil profile data problem returned, so I excavated the snow at the post and left everything uncovered. There are some chewed up wires there (since retaped) but not sure if this is where the problem is or not. All soil moisture sensors are failing to read, not just the ones with chewed wires. Hopefully this will keep the data coming in for a while.

Mar 8, 2012

Noticed soil profiles were not working (all data was -6999) yesterday, went up to fix this.

  • Fixed one loose wire on MUX3 (Sentek sensor profile 9)
  • There seems to be some loose wiring at the base of the Forest1 datalogger post, but it is difficult to identify. Excavating the snow and adjusting the wire caging seemed to help.
  • Re-covered the base with snow.

Feb 18, 2012

  • Sampled all inlets
  • Measured swe in all plots (4 measurements each)
  • Lowered ropes a bit
  • Modified Forest1 datalogger program to get Sentek sensor at profile 10 running finally (had to remove loops in program).
  • Put out stormboard.

Jan 17, 2012

  • Went to Hidden Canyon and sent v6 program to Forest1 datalogger manually
  • As of the 4pm data collection this appears to be working (except for profile 10 sentek sensor) - there is new data starting at 2pm.

Jan 8, 2012

  • Rewrote and sent a datalogger program to Forest1 datalogger. Program includes sentek sensors and new CS-616s in measurements and final storage table (averages).
  • Sent at ~4pm after downloading all data and archiving it
  • resent at 12am (9th) - doesn't appear to be sending the program, probably because the radio is turning off.

Jan 4, 2012

  • Sampled all inlets
  • SWE measurements in plot 1, 2, 3, 4 (4 measurements each)
  • Rewired Sentek sensors (12V power and Gnd are now on the terminal strips with the 616's)

2011

Oct 28, 2011

  • 9:15am - Sent new program (v5) to Forest datalogger that includes profiles 6 and 8.
  • EDIT (1-6-2012): apparently I forgot to average the new sensor readings and add them to the output table, so it will have to be resent.

Oct 26, 2011

  • Wired up all new sensors to MUX3 - P6, 8, 9 & 10.
  • Fixed IR radiometer on met tower
  • Datalogger working - not sure what this intermittent problem is about - will look at data

Oct 22, 2011

  • Installed Sentek sensors in profiles 9 and 10 using slurry method
  • Mid-day water potential measurements (skipped big trees)
  • Wired sensors
  • Datalogger not working?

Oct 16, 2011

  • Predawn (6:30-7:30am) water potential measurements (skipped large trees).
  • Measured surface soil moisture w/ campbell handheld probe at all locations (morning).
  • Soil respiration measurements (10-1pm)

Oct 15, 2011

  • Collected litterbags
  • Installed 2 new soil moisture profiles (6 and 8) in plots 3 and 4
  • There is a problem with the datalogger again - doesnt appear to be getting good data. Maybe the datalogger needs replacing?

Oct 11, 2011

  • Had to resend datalogger program again

Sept 23, 2011

  • Midday(1:30pm-2:30pm) and predawn (6:10-7:10am) water potential measurements (skipped large trees due to lack of pressure gas).
  • Measured surface soil moisture w/ campbell handheld probe at all locations (morning).
  • Soil respiration measurements (10-1)

Sept 9-10, 2011

  • Midday(3:30pm-5pm) and predawn (6-7:30am) water potential measurements (including large trees).
  • Measured surface soil moisture w/ campbell handheld probe at all locations (morning of 10th).
  • Soil respiration measurements (9th - 1-3pm).
  • Restarted Forest1 datalogger - there may be a gap present in the data around this time.

Aug 26-27, 2011

  • Midday(3pm-5pm) and predawn (5-7am) water potential measurements (including large trees).
  • Measured surface soil moisture w/ campbell handheld probe at all locations (morning of 27th).
  • Soil respiration measurements (26th - 12-2:30pm).

Aug 11-12, 2011

  • Midday(2:30pm-4pm) and predawn (5-7am) water potential measurements.
  • Added large trees from Plots 1 & 2 to xylem wp measurements (5 trees in each plot - subset of last year's trees)
  • Measured surface soil moisture w/ campbell handheld probe at all 6 plots, 6 locations each (morning of 12th).
  • Soil respiration measurements (12th - 9-11:30am).

July 28, 2011 - Mike B.

  • Midday(12pm-1:30pm) and predawn (6-7am) water potential measurements.
  • Soil respiration measurements (9-11:30am).

July 20, 2011 - Davis U.

  • Fixed all guywires etc on weather stations with Davis.

July 13-14, 2011

  • First midday xylem water potential measurements around 3-5pm
  • Hammered in soil collars, 4 per plot, adjacent to litterbags (but randomized)
  • First predawn xylem water potential around 5-7am (14th)
  • First soil respiration at 9-12am (14th)

July 12, 2011 - Davis U.

  • SWE at ALL locations (and all were melted)
  • Took photos of the spatial extent of snowmelt.
  • Logged melted grid points (only one still has snow)
  • Collected litterbags (except for P3-2 which was still snowcovered)

June 29, 2011

  • Measured SWE at ALL locations
  • Took photos of the spatial extent of snowmelt.
  • Logged melted grid points

June 23, 2011

  • Measured SWE at 12 locations per treatment
  • Took photos of the spatial extent of snowmelt.
  • Collected snow columns for total dust loading measuremnts - 1 per plot
  • Logged melted grid points

June 15, 2011

  • 6th dust application
  • Measured SWE at 12 locations in each plot
  • Took photos
  • Met tower IR thermometer has a loose wire (EX terminal)
  • Plot 2 has melted out in the middle of the plot, and litterbag set 3 is exposed.
  • 30N 30E stake is almost exposed melted out.

June 7, 2011

  • Measured SWE at 12 locations in each plot
  • Took gas samples from all inlets
  • Collected dust cores in the open from the last few dust events
  • Reconnected Forest1 datalogger to its radio

June 1, 2011

  • Dust dep 5
  • Fixed MUX1 problem - moving snowpack had pulled the COM terminals loose (at the MUX)
  • Took a few photos

May 27, 2011

  • Collected exetainer samples from all inlets (Not measured yet - LiCor may be broken!)
  • Federal sampler SWE measurements in 24 locations (12 per treatment)
  • Stormboard sample
  • Collected dust cores from the May 15-16 event

May 16, 2011

  • Federal sampler samples in 12 locations (control and treatment)
  • Surface "after" samples in forest (3x each in dust and control plots)
  • Surface samples in the open (3x each in dust and control areas near towers)
  • Took some photos
  • Brought back stormboards from BCL, BCM. and BCH.

May 12, 2011

  • Storm board sample (PCAPS method)
  • Surface samples in the open (3x near towers)
  • Dust application in 3 locations in the open (adjacent to surface samples above)
  • Took albedo photos of Ctl snow surface vs. dusted snow surface (in adjacent slope positions)
  • First set (6 photos) 11:45 to 12:15pm
  • Second set (6 photos) 1:45-2:15pm
  • Surface "before" samples in forest (3x each in dust and control plots)
  • Dust deposition 4
  • Federal sampler samples in 7 locations (control and treatment)
  • Collected exetainer samples from all inlets (Measured on the 13th - OK)
  • Took a number of photos in the forest of dust/control areas - 2pm

May 4, 2011

  • Storm board sample (PCAPS method)
  • Full column sample (PCAPS method)
  • Kelly samples of the entire column (10cm increments)
  • Surface samples in the open (3x near towers)
  • Surface samples in forest (3x each in dust and control plots)
  • This is at essentially peak SWE (according to the Brighton SNOTEL)
  • Dust is still active at the top of the snowpack.

May 1, 2011

  • Collected exetainer samples from all inlets (Measured these on the 3rd - OK).
  • Measured SWE in plots 1-6 (16 measurements)
  • Dust deposition 3

Apr 15, 2011

  • RE-collected exetainer samples from all inlets (Measured these the following morning - OK).
  • Measured SWE in plots 1-6 (20 measurements)
  • Dust deposition 2

Apr 12, 2011

  • Collected exetainer samples from all inlets (Measured these the following morning - :!: all were atmospheric:!:).
  • Measured SWE in plots 1-4
  • Fixed ropes
  • Dug out met tower

Apr 2, 2011

  • Measured SWE in all plots, these are good numbers this time. Used lube on tubes.
  • Collected "after" sublimation samples from N & S facing slopes in HC

Mar 31, 2011

  • First dust deposition, on all 3 treatment plots
  • Measured SWE in all plots, but sampling was difficult and I don't have too much faith in the numbers.
  • Collected sublimation samples from N & S facing slopes in HC

Mar 27, 2011

  • Fixed/replaced ropes
  • Wired charging station together and connected battery
  • Dug out solar tower a bit.

Mar 23, 2011

  • Collected exetainer samples from all inlets (Measured these the following morning).
  • Measured SWE in corridor 1. Conditions made this difficult, and there are only 2-3 reliable measurements.
  • Fixed ropes - one needs to be replaced
  • Collected snow sample from storm board.

Feb 18, 2011

  • Collected exetainer samples from all inlets, including t1-t3 series for 3 inlets. (Measured these the following morning)
  • Measured SWE in six locations in corridor 1
  • Fixed ropes
  • Collected six snow cores from N of towers for dust sampling
  • Dug out tower bases a bit

January 2011

Find dates for these!!

  • Dug out tower bases
  • Installed caps for inlet tubing
  • First sampling of below snow inlets
  • Restarted measurements at Forest site Jan 11.
  • Collected snow samples at board
  • Maintained ropes and signs, but there has been some traffic.

2010

Early December 2010

  • Forest 1 datalogger seems to have failed in early November. Began troubleshooting this.
  • Installed signs around perimeter of forest and tightened up ropes
  • There are some tracks through the area already

15-16 Oct, 2010

  • Wired MUX 3 to Forest datalogger
  • Installed new datalogger program and made sure it was working (see here)
  • Forest1 measurements became functional at ~2:30pm Oct 16th
  • Deployed all litterbags on the 15th (180 in 36 reps)
  • Final xylem pressure and soil respiration measurements for the season (all on the 16th) but forgot soil temp probe.
  • Tidied all wires and tubing and sealed enclosures for winter.

** Early October visits

  • Installed profiles 5 and 7
  • Finished installing undersnow inlets and measured all tubing lengths.
  • More litter collected and litter bags made, weighed, and filled.
  • Installed post and enclosure for MUX 3
  • Began rewiring Forest1 datalogger and connections to MUX 1 & 2
  • Downloaded Forest1 data on Oct 8th, up to 11am averages
  • Forest1 down from Oct 8th to the 15th

13 - 25 Sept, 2010

Several visits during this time:

  • Installed wiring for charging station at solar tower, reoriented 30W panel, and completed caging.
  • Installed undersnow CO~2~ inlets and tubing for plots 1, 2, and the bottom half of 3.
  • Collected some litter, but more will be necessary.
  • Flagged plots 1-6 with pink flagging tape
  • Dug holes for profiles 5 & 7 (new plot and profile scheme detailed here)
  • Measured respiration and xylem psi in plots 1 and 2.

8-10 Sept, 2010

  • Installed caging around solar, met, and forest towers and fixed all wiring that was chewed.
  • Replaced 3 malfunctioning Decagon sensors (P1-60, P5-20, P7-60)
  • Forest 1 radio and relay are installed and functioning

3-4 Sept, 2010

  • Measured xylem water potential in the afternoon (2-4pm, 3rd).
  • Measured soil respiration at all collars (10:30am-1pm, 3rd)
  • Measured predawn xylem water potential (5-7am, Aug 4th).
  • Downloaded data from both dataloggers.
  • Continued install of Forest 1 radio, and put new program on Forest1 datalogger.
  • Put out tarps for litter collection.
  • Examined potential sites for new SM/ST profiles.
  • Fixed chewed up wiring to Treatment IR radiometer, there is other rodent damage to fix.

26 Aug, 2010

  • Installed wireless modem, Base radio, Met1 radio, and associated antennas and relays.
  • New datalogger program to Met1 datalogger (added table 2, changed Judd depth sensor offset)
  • Dowloaded data from both dataloggers (after 5pm average)
  • Partial install of Forest1 radio
  • Can connect to Met1 datalogger as of 8am Friday morning --- //Greg Maurer2010/08/27 11:30//

13-14 August, 2010

  • Measured xylem water potential in the afternoon (2-4pm, Aug 13).
  • Measured predawn xylem water potential (5-7am, Aug 14).
  • Measured soil respiration at all collars (Aug 14, 8-11:30am)
  • Downloaded all data from dataloggers.
  • Checked wiring for Profile 6-20cm - OK
  • Brought collars from north side of Hidden Canyon back.
  • Collected Boletes!

2-3 August, 2010

  • Measured xylem water potential in the evening (5pm, Aug 2).
  • Measured predawn xylem water potential (4am, Aug 3).
  • Downloaded all data from dataloggers.

23 July, 2010

  • Measured soil respiration at all collars - data looks ok.

22 July, 2010

  • Downloaded data from dataloggers
  • Soil respiration attempt # 2 FAILED - again due to batteries. Try again tomorrow.

16 July, 2010

  • Soil respiration measurements - FAILED - batteries died, need at least 2 more good batteries to complete all 20 collars.

12 July, 2010

  • Downloaded data from dataloggers
  • All grid points are melted out.
  • Adjusted lower (30w) solar panel a bit.
  • Labeled collars

23 June, 2010

  • Downloaded data from both dataloggers.
  • Measured SWE in control plots (n-10), treatment plots (n-10), and on the east side of treatment (n=5)
  • Most of Control and Treatment are melted out, no new dust needed
  • Logged melt progress at grid points.
  • Installed respiration collars, 10 in each swath

16 June, 2010

  • Downloaded data from both dataloggers.
  • Measured SWE in control plots (n-10), treatment plots (n-10), and on the east side of treatment (n=5)
  • No new dust applied, old dust is still visible.
  • Logged melt progress at grid points.
  • Fixed guywire on solar tower.

9 June, 2010

  • Downloaded data from both dataloggers.
  • Measured SWE in control plots (n-10), treatment plots (n-10), and on the east side of treatment (n=5)
  • No new dust applied, old dust is still visible.
  • Dug snow pits and measured depth of dust layers.
  • Logged melt progress at grid points

3 June, 2010

  • Downloaded data from both dataloggers.
  • Measured SWE in control plots (n-10), treatment plots (n-10), and on the east side of treatment (n=5)
  • Sixth dust application - 3.5 mason jars (12000g each)
  • There is bare ground visible in the middle of the treatment plot.

25 May, 2010

  • Measured SWE in control plots (n-10), treatment plots (n-10), and on the east side of treatment (n=5)
  • Fifth dust application - 3.5 mason jars (12000g each).

14 May, 2010

  • Downloaded data from both dataloggers
  • Measured SWE in control plots (n-10), treatment plots (n-10), and on the east side of treatment (n=5)
  • Fourth dust application - 3.5 mason jars (12000g each).

6 May, 2010

  • Downloaded data from both dataloggers.
  • Measured SWE in control plots (n=6), treatment plots (n=6), and on the east side of treatment (n=3).
  • Third dust application - 4 mason jars (1200g each).

24 April, 2010

  • Downloaded data from both dataloggers.
  • Measured SWE in control plots (n=6), treatment plots (n=6), and on the east side of treatment (n=3).
  • Second dust application went well - 4 mason jars (1200g each).

8 April, 2010

  • Downloaded data from both dataloggers
  • First dust application. 3 mason jars (~1200g each) covers roughly the entire area.
  • More battery power might help.

25 March, 2010

  • Downloaded data from both dataloggers.
  • Changed wiring from Forest1 to MUX2 - Power and signal for Campbell sensors was moved to the extra pair of wires in Line 2.
  • Carried up some dust and the vacuum.

18 March, 2010

  • Downloaded data from both dataloggers
  • Dust application should commence next week.

4 March, 2010

  • Downloaded data from both dataloggers
  • Checked wiring at MUX2 and Forest1 to troubleshoot Campbell sensors --- fixed one potential wiring problem at MUX2
  • Mounted treatment IR radiometer on post
  • Extended rope at top of stand

18 Feb, 2010

  • Downloaded data from both dataloggers.
  • Tested 3 malfunctioning Decagon sensors at sensor leads with the testing datalogger. All appear broken.
  • Fixed EDLOG problem with Canopy and Control (input terminal mismatch). They now appear to be working.
  • Measured slope and aspect of Met and Forest towers
  • Hammered in mounting post for Treatment IR radiometer
  • Added ropes at top of stand - still needs signs

4 Feb, 2010

  • Gave Tom Painter and Dave a tour the site and talked science.
  • Roped off another 100 feet of forest at the lower east edge of the plot.

2 Feb, 2010

  • Downloaded data from both dataloggers
  • Fixed wiring at Mux 2 (one free wire, some terminals a bit loose)
  • Verified that wiring from Mux 2 to Forest 1 datalogger is connected correctly.
  • Looked for shorts, but didn't find anything too bad - some cable shields are probably touching, but it shouldn't matter (right?).
  • Added another 50 feet of rope, but there is still more needed below that.

25 Jan, 2010

  • Downloaded data from both dataloggers
  • Reversed wiring for downward looking PAR - should be working now.
  • Changed REBS negative correction factor to a negative value in Met1 EDLOG program.
  • Roped and signed east side of forest, lower paths still need to be blocked

14 Jan, 2010

  • Met tower
  • Lowered met tower crossbars - crossbar 1 is at roughly 3.85 m, crossbar 2 is at 3.7m
  • Leveled upward PAR, downward PAR, wind, and Rnet sensors
  • Wind sensor is oriented properly now (arrow facing S) and is unobstructed
  • Reoriented met tower so crossbars are N/S (1) and E/W (2)
  • Connected downward PAR sensor leads, bridged with 560Ω resistor at terminals, and jumpered Diff Low to ground
  • New program (HC_MET1_V2.csi) uploaded. All sensors but downward PAR appear to be working now.
  • Forest tower
  • Pointed Canopy IR radiometer horizontally in the downhill direction (southwest)
  • New program (HC_FOREST1_v3.csi) uploaded. This made all the CS-615s work
  • Collected data from both dataloggers.

10 Jan, 2010

  • Tried to troubleshoot the Decagon sensor problems
  • Checked junction to MUX wiring and it appears to be sound. Wires are correctly connected and it looks like there is excitation and a signal at the sensor leads.
  • Don't know why there is -INF or zeros at the Forest1 datalogger (could be faulty sensors)
  • Also tried and 80 ms delay before powering up sensors - didn't help
  • Pit 7 60cm is still going in and out also.
  • Downloaded data from Forest1

7 Jan, 2010

  • Downloaded data and uploaded HC_Forest1_v2.csi to Forest1 (small delay change in serial io)
  • Attached windset to Met1 logger (with extension) and treatment IR radiometer (with extension) to Forest1
  • New signs
  • Tried to troubleshoot soil moisture sensors, but two decagons and the 615s are not working
  • Tightened all MUX terminals (this may have fixed one sensor)
  • Checked juction box 1 and it looks OK
  • Found which Campbell sensors are 615's
  • Problem with remaining decagons is likely a wiring problem from junction box to multiplexer (or bad sensors)

2009

20 Dec, 2009

  • Downloaded data from Forest1 and Met1 datalogger
  • Finished attaching sensors to Met1 and Forest1 dataloggers
  • Met1 wind sensor, downward PAR, and forest treatment IR radiometer still not connected

18 Dec, 2009

  • Downloaded data from Forest1 datalogger